Key numbers
- Formula: L (ft) × W (ft) × T (in) ÷ 324 = cubic yards
- 1 yd³ covers 81 ft² at 4 in, 65 ft² at 5 in, 54 ft² at 6 in
- 45 × 80 lb or 60 × 60 lb bags make one cubic yard
- Add 10% for waste, then round up to the next ¼ yard
On this page
- How to use the Concrete Slab Calculator
- How to calculate concrete for a slab
- Concrete for common slab sizes
- How thick should a concrete slab be?
- Monolithic slabs: slab and footing in one pour
- Concrete pad calculator: shed, AC, hot tub and generator pads
- How to measure a concrete slab
- Round, L-shaped and odd slabs
- Metric slab volumes
- How much does a concrete slab weigh?
- Slope and drainage
- Prepare the base before you measure
- Ready-mix or bags for a slab?
- Ordering concrete for a slab
- Common mistakes when estimating a concrete slab
- Slab calculator vs other concrete calculators: which one to use
- Frequently asked questions
How to use the Concrete Slab Calculator
- 1Choose the shapePick slab / pad or round slab. Each shape uses its own volume formula.
- 2Pick your unitsEvery dimension has its own unit menu (in, ft, yd, cm or m); changing one converts that number so the size stays the same. The US / Metric switch sets all fields to feet and inches or meters and centimeters and resets them to typical values.
- 3Enter the dimensionsType the length (default feet), width (default feet) or thickness (default inches). Measure the inside of the forms and the depth in several places.
- 4Set waste and quantityUse the waste slider (0 to 20%, default 10%) and allow more on uneven ground. If you have several identical pours, enter how many.
- 5Read the resultsSee the volume in cubic yards, cubic feet and cubic meters, the ready-mix order rounded up to ¼ yard, the number of 90, 80, 60, 50 and 40 lb bags rounded up, and the weight at the density you choose (150, 145 or 140 lb/ft³).
- 6Price it and save itPick a pricing basis (per cubic yard, per cubic meter or per bag of the highlighted size) and enter your local price for a material cost. Use Add to project to total several pours, and Copy link to share the exact result.
Results update as you type. Back to the calculator ↑

How to calculate concrete for a slab
A slab is a flat box, so its volume is length × width × thickness. The only trap is units: slabs are measured in feet, thickness is given in inches, and ready-mix is sold in cubic yards. This one formula handles all three:
Cubic yards = length (ft) × width (ft) × thickness (in) ÷ 324
The 324 is 12 inches per foot × 27 cubic feet per cubic yard. Using it means you never convert the thickness by hand. For cubic feet instead, multiply length × width × thickness in inches and divide by 12.
- Measure the inside of the forms, not the outside. Round fractions of an inch up to the next ¼ in.
- Measure the thickness in three or four places. Bases are rarely flat. Use the average, or the deepest reading if the difference is more than ½ in.
- Run the formula, or enter the numbers in the calculator above. It also gives cubic feet and cubic meters.
- Add 10% for waste, then round up to the next ¼ yard for ready-mix, or to the next whole bag.
Worked example: 12 × 12 ft shed pad, 4 in thick
- 12 × 12 × 4 ÷ 324 = 1.78 yd³ (48 ft³)
- Add 10%: 1.78 × 1.10 = 1.96 yd³ → order 2 yd³
- In bags: 52.8 ft³ ÷ 0.60 ft³ = 88 × 80 lb bags (118 × 60 lb)
- Wet weight at 150 lb/ft³: about 7,200 lb in place
Concrete for common slab sizes
People rarely search for a formula. They search for their slab: “how many yards for a 24×24”, “bags for a 10×10”. This table answers the common sizes at 4 in thick. Every figure comes from the same calculation the tool uses.
| Slab size | Cubic feet | Cubic yards | Order with 10% extra | 80 lb bags (exact) | 80 lb bags (+10%) |
|---|---|---|---|---|---|
| 4 × 4 ft | 5.3 | 0.20 | ¼ yd³ | 9 | 10 |
| 4 × 8 ft | 10.7 | 0.40 | ½ yd³ | 18 | 20 |
| 8 × 8 ft | 21.3 | 0.79 | 1 yd³ | 36 | 40 |
| 10 × 10 ft | 33.3 | 1.23 | 1½ yd³ | 56 | 62 |
| 10 × 12 ft | 40.0 | 1.48 | 1¾ yd³ | 67 | 74 |
| 12 × 12 ft | 48.0 | 1.78 | 2 yd³ | 80 | 88 |
| 12 × 24 ft | 96.0 | 3.56 | 4 yd³ | 160 | 176 |
| 20 × 20 ft | 133.3 | 4.94 | 5½ yd³ | 223 | 245 |
| 20 × 30 ft | 200.0 | 7.41 | 8¼ yd³ | 334 | 367 |
| 24 × 24 ft | 192.0 | 7.11 | 8 yd³ | 320 | 352 |
| 30 × 30 ft | 300.0 | 11.11 | 12¼ yd³ | 500 | 550 |
| 30 × 40 ft | 400.0 | 14.81 | 16½ yd³ | 667 | 734 |
| 40 × 60 ft | 800.0 | 29.63 | 32¾ yd³ | 1,334 | 1,467 |
At 6 in thick every figure is 1.5 times larger. A 24 × 24 ft garage slab at 6 in is 10.67 yd³, ordered as 11¾ yd³.
The same sizes at 4, 5 and 6 inches
Thickness changes the order more than most people expect. This table gives the exact volume and the order (10% extra, rounded up to ¼ yd³) for sizes commonly poured for patios, shed bases and garages.
| Slab size | Area (ft²) | 4 in (yd³) | Order at 4 in | 5 in (yd³) | Order at 5 in | 6 in (yd³) | Order at 6 in |
|---|---|---|---|---|---|---|---|
| 8 × 10 ft | 80 | 0.99 | 1¼ | 1.23 | 1½ | 1.48 | 1¾ |
| 10 × 16 ft | 160 | 1.98 | 2¼ | 2.47 | 2¾ | 2.96 | 3½ |
| 12 × 16 ft | 192 | 2.37 | 2¾ | 2.96 | 3½ | 3.56 | 4 |
| 12 × 20 ft | 240 | 2.96 | 3½ | 3.70 | 4¼ | 4.44 | 5 |
| 16 × 16 ft | 256 | 3.16 | 3½ | 3.95 | 4½ | 4.74 | 5¼ |
| 16 × 20 ft | 320 | 3.95 | 4½ | 4.94 | 5½ | 5.93 | 6¾ |
| 20 × 24 ft | 480 | 5.93 | 6¾ | 7.41 | 8¼ | 8.89 | 10 |
| 24 × 30 ft | 720 | 8.89 | 10 | 11.11 | 12¼ | 13.33 | 14¾ |
| 30 × 30 ft | 900 | 11.11 | 12¼ | 13.89 | 15½ | 16.67 | 18½ |
| 30 × 40 ft | 1,200 | 14.81 | 16½ | 18.52 | 20½ | 22.22 | 24½ |
How thick should a concrete slab be?
Thickness has the biggest effect on volume, and on cost. Going from 4 in to 6 in uses 50% more concrete.
| Use | Typical thickness | ft² per yd³ | yd³ per 100 ft² | 80 lb bags per 100 ft² (exact) | 80 lb bags (+10%) |
|---|---|---|---|---|---|
| Topping over sound concrete | 2 in | 162 | 0.62 | 28 | 31 |
| Light garden path | 3 in | 108 | 0.93 | 42 | 46 |
| Walkway, patio, shed pad | 4 in | 81 | 1.23 | 56 | 62 |
| Driveway for cars | 4–5 in | 65–81 | 1.23–1.54 | 56–70 | 62–77 |
| Garage floor, heavy pickups | 5–6 in | 54–65 | 1.54–1.85 | 70–84 | 77–92 |
| RV pad, hot-tub pad | 6 in | 54 | 1.85 | 84 | 92 |
| Equipment pad, thickened edge | 8 in+ | 40.5 | 2.47 | 112 | 123 |
Bag counts in the 8 in+ row are for exactly 8 in. These are common practice, not code. Garage floors, house slabs and anything structural must follow your plans and local building code. Bagged mixes such as QUIKRETE Concrete Mix are rated for pours 2 in thick or more, so thinner toppings need a different product.
2 in and 3 in slabs
A 2 in or 3 in slab saves concrete but leaves little margin. A 10 × 10 ft area at 3 in needs 0.93 yd³ (42 × 80 lb bags) against 1.23 yd³ at 4 in, and at 2 in it needs 0.62 yd³ (28 bags). Thin pours suit a topping over sound existing concrete or a light garden path, not a pad that will carry a shed, a car or a hot tub. If you are levelling an indoor floor rather than pouring a slab, use the coverage printed on the self-levelling product’s bag instead of this calculator.
Thickened edges add more than you think
Shed and garage slabs often have a turned-down edge 8–12 in deep around the perimeter. Calculate it separately as described in the next section and use Add to project in the calculator to total it with the slab.
Monolithic slabs: slab and footing in one pour
A monolithic slab (also called a turned-down or thickened-edge slab) pours the floor and its perimeter footing at the same time. To estimate it, calculate the flat slab, then add the edge as a beam around the perimeter, counting only the depth below the slab so the overlap is not counted twice.
Edge (ft³) = inside perimeter (ft) × edge width (ft) × depth below slab (ft)
Use the inside perimeter, which is the outside perimeter minus four times the edge width, so the corners are not counted twice.
Worked example: 24 × 24 ft monolithic garage slab
- Slab: 24 × 24 × 4 ÷ 324 = 7.11 yd³ (192 ft³)
- Edge: 12 in wide, 12 in total depth, so 8 in below the 4 in slab
- Edge length: 96 ft perimeter − 4 ft for corners = 92 ft; 92 × 1 × 0.667 = 61.3 ft³ = 2.27 yd³
- Total: 253.3 ft³ = 9.38 yd³; with 10% extra 10.32 yd³ → order 10½ yd³
- The edge is 24% of the pour. Leaving it out would leave you more than 2 yd³ short.
A smaller 12 × 16 ft shed slab with the same edge works out at 2.37 yd³ for the slab plus 1.28 yd³ for the edge, 3.65 yd³ in all (order 4¼ yd³). Edge width, depth and any frost protection come from your plans and local code; the arithmetic stays the same.
Concrete pad calculator: shed, AC, hot tub and generator pads
A concrete pad is just a small slab, so a concrete pad calculator and a slab calculator use the same formula: length × width × thickness in inches ÷ 324. Enter the pad size and thickness above. The table gives common pad sizes, with 10% extra included in the order and the +10% bag count.
| Pad | Size | Thickness | Cubic feet | Cubic yards | Cubic metres | Order (+10%) | 80 lb bags (exact) | 80 lb bags (+10%) | 60 lb bags (+10%) |
|---|---|---|---|---|---|---|---|---|---|
| AC condenser pad | 3 × 3 ft | 4 in | 3.0 | 0.11 | 0.085 | ¼ yd³ | 5 | 6 | 8 |
| Heat pump / AC pad | 3 × 4 ft | 4 in | 4.0 | 0.15 | 0.113 | ¼ yd³ | 7 | 8 | 10 |
| Generator pad | 4 × 4 ft | 4 in | 5.3 | 0.20 | 0.151 | ¼ yd³ | 9 | 10 | 14 |
| Hot tub pad | 8 × 8 ft | 4 in | 21.3 | 0.79 | 0.604 | 1 yd³ | 36 | 40 | 53 |
| Hot tub pad | 8 × 8 ft | 6 in | 32.0 | 1.19 | 0.906 | 1½ yd³ | 54 | 59 | 79 |
| Shed pad | 8 × 10 ft | 4 in | 26.7 | 0.99 | 0.755 | 1¼ yd³ | 45 | 49 | 66 |
| Shed pad | 10 × 12 ft | 4 in | 40.0 | 1.48 | 1.133 | 1¾ yd³ | 67 | 74 | 98 |
| Shed pad | 12 × 16 ft | 4 in | 64.0 | 2.37 | 1.812 | 2¾ yd³ | 107 | 118 | 157 |
The thicknesses in the table are examples for the arithmetic, not a recommendation for your load. Many AC and generator makers sell or specify a pad, often a precast or composite one, and their installation manual sets the size and height. A hot tub maker’s pre-delivery guide states what base its tub needs, and a shed maker’s foundation sheet gives the pad size; the pad is often a few inches larger than the shed floor. Anything that carries a vehicle, a lift or heavy equipment needs a design from your plans or an engineer.
- Patio. A 12 × 16 ft patio at 4 in is the same volume as the 12 × 16 shed pad: 2.37 yd³, ordered as 2¾ yd³. See concrete patio cost to price it.
- Sidewalk. A 4 ft wide walk at 4 in uses 0.49 yd³ per 10 ft; a 4 × 50 ft walk is 2.47 yd³ (123 × 80 lb bags with extra).
- Small pads in bags. Every pad up to 4 × 4 ft at 4 in fits in ten or fewer 80 lb bags, so bags beat a ready-mix delivery there.
How to measure a concrete slab
Measure the inside of the forms (or the area you will form) in feet, then measure the depth from a string line to the base in several places. Those three numbers, length, width and average thickness, are all the calculator needs.
- Length and width. Hook a tape on the inside face of one form board and read to the inside face of the other. Do both long sides and both short sides; if they differ, use the larger figure. Convert inches to decimal feet: 6 in is 0.5 ft, 3 in is 0.25 ft.
- Check it is square. Measure both diagonals. Equal diagonals mean a true rectangle. Unequal diagonals mean the forms are racked, and you should fix them before the pour rather than adjust the estimate.
- Thickness. Stretch a string tight across the tops of the forms and measure down to the base at three or four points, including the middle. Use the average, or the deepest reading if they differ by more than ½ in.
- Odd shapes. Split the area into rectangles and circles, measure each, and total them with Add to project. Triangles are half the rectangle around them.
- Metric. Measure in metres and centimetres and switch the calculator to Metric: a 4 × 4 m slab 10 cm thick is 1.6 m³.
Write the numbers on a sketch with each rectangle labelled. It makes the order easy to check when you call the plant, and it shows where a thickened edge or a step-down needs its own line.

Round, L-shaped and odd slabs
Choose Round slab in the calculator for circular pads such as fire-pit pads and round patios. The volume is π × radius² × thickness. At 4 in thick:
| Diameter | Cubic feet | Cubic yards | Order with 10% extra | 80 lb bags (+10%) |
|---|---|---|---|---|
| 6 ft | 9.42 | 0.35 | ½ yd³ | 18 |
| 8 ft | 16.76 | 0.62 | ¾ yd³ | 31 |
| 10 ft | 26.18 | 0.97 | 1¼ yd³ | 48 |
| 12 ft | 37.70 | 1.40 | 1¾ yd³ | 70 |
| 16 ft | 67.02 | 2.48 | 2¾ yd³ | 123 |
For L-shaped or irregular slabs, split the shape into rectangles, calculate each, and add them with Add to project. An L made of a 20 × 12 ft and a 10 × 8 ft rectangle at 4 in is 2.96 + 0.99 = 3.95 yd³ (order 4½ yd³). For a triangle, calculate the rectangle around it and halve the result.
Metric slab volumes
Outside the US, slabs are measured in metres and centimetres and ready-mix is sold by the cubic metre. The calculation is simpler because there is no 324:
Cubic metres = length (m) × width (m) × thickness (cm) ÷ 100
| Slab | Thickness | m³ | m³ with 10% extra | Wet weight (kg) |
|---|---|---|---|---|
| 3 × 3 m | 10 cm | 0.90 | 0.99 | 2,162 |
| 4 × 4 m | 10 cm | 1.60 | 1.76 | 3,844 |
| 5 × 5 m | 10 cm | 2.50 | 2.75 | 6,007 |
| 6 × 4 m | 12.5 cm | 3.00 | 3.30 | 7,208 |
| 6 × 6 m | 15 cm | 5.40 | 5.94 | 12,975 |
Switch the calculator to Metric to enter metres and centimetres directly. Weights use 150 lb/ft³ (about 2,400 kg/m³); your supplier can confirm the density of its mix.
How much does a concrete slab weigh?
About 50 lb per square foot at 4 in thick (75 lb at 6 in), using 150 lb/ft³ for normal concrete, so a 12 × 12 ft slab at 4 in weighs about 7,200 lb (3,266 kg). For other sizes, densities and debris tonnage, use the concrete weight calculator; weight does not tell you how much load a slab can carry.
Slope and drainage
Outdoor slabs are usually formed with a slight fall so water runs off. Many builders use about ⅛–¼ in per foot away from buildings; your plans or local code set the figure. A 12 ft patio at ⅛ in per foot drops 1.5 in from one side to the other, and at ¼ in per foot it drops 3 in. A 20 ft slab drops 2.5 in or 5 in.
Slope does not change the volume when the thickness stays the same, because the whole slab tilts with its base. It only adds concrete if the base is flat and you build the fall into the concrete. In that case measure the thickness at the high and low edges and enter the average.
Prepare the base before you measure
The base affects the order almost as much as the size. A gravel base ½ in low across a 20 × 20 ft slab adds 0.62 yd³ of concrete; 1 in low across a 24 × 24 ft slab adds 1.78 yd³.
- Remove topsoil and organic material down to firm subgrade.
- Spread compactable gravel and compact it in layers. The gravel calculator gives tons for the base.
- Set forms with the fall described above, so water drains away from buildings.
- Add a vapor barrier under interior slabs and reinforcement where your plans call for it. The rebar calculator sizes a grid.
- Re-measure depth from a string line stretched across the forms the day before the pour, and update the calculator if the base has moved.
Ready-mix or bags for a slab?
Ready-mix trucks deliver concrete already mixed and priced by the cubic yard. Bags are mixed on site. The volume usually decides it:
- Under about ½ yd³ (around 23 × 80 lb bags): bags are practical, and you avoid delivery charges.
- About ½–1 yd³: compare a small ready-mix delivery with buying 23–45 bags and renting a mixer.
- Over 1 yd³: ready-mix is usually far less work. One yard is 45 bags, about 3,600 lb of dry mix to lift and mix, and big pours mixed by hand risk cold joints.
Three yards in bags is 135 × 80 lb or 180 × 60 lb. Ask your plant about its minimum order and any short-load charge before you decide; both vary by supplier. To price either option, use the cost to pour a concrete slab calculator with your local quotes.
Ordering concrete for a slab
When you call the plant, give them the order quantity, not the exact volume. For the 12 × 12 ft pad above that means “2 yards”, not “1.78”. Have these ready:
- Quantity in cubic yards (or m³), already rounded up to the plant’s increment.
- Use and thickness, for example “4 in exterior patio slab”. The plant can suggest a mix for that use; your plans may specify one.
- Access. How close the truck can get to the forms. If it cannot reach them, ask about a pump or plan wheelbarrow runs.
- Timing. Book the pour for when the crew, tools and finishing help are on site, and check the forms and base the day before.
If the slab needs several trucks, ask the plant to space the loads so each arrives before the previous concrete starts to set. A 30 × 40 ft slab at 4 in is 16½ yd³ to order, so plan to place it in sections from one side to the other.
Common mistakes when estimating a concrete slab
- Treating inches as feet. 12 × 12 × 4 gives 576, which is not cubic feet. Divide by 324 for yards or by 12 for cubic feet; the right answer is 48 ft³ (1.78 yd³).
- Measuring the outside of the forms. Form boards are about 1½ in thick, so outside dimensions add about 3 in each way and overstate the pour.
- Trusting a nominal 4 in. A base ½ in low across a 12 × 16 ft slab adds 0.30 yd³. Check depth in several places from a string line.
- Forgetting the thickened edge. On a 24 × 24 ft monolithic slab the edge adds 2.27 yd³, about a quarter of the pour.
- Ordering the exact volume. With no allowance, a small spill or form bulge leaves you short and creates a cold joint. Add 10%, then round up to the next ¼ yd³.
- Mixing up bag sizes. 45 × 80 lb bags make a yard, but it takes 60 × 60 lb bags. Use the yield printed on the bag you buy.
Slab calculator vs other concrete calculators: which one to use
- This slab calculator: any flat rectangle or circle with one thickness, including patios, pads, sidewalks, shed bases and garage floors.
- Concrete driveway calculator: a long slab with an apron, flares and parking pads, usually 4–6 in thick.
- Concrete footing calculator: trench footings and perimeter footings poured separately from the slab.
- Concrete bag calculator: you already know the volume and only need counts for 40, 50, 60, 80 or 90 lb bags.
- Concrete steps calculator: poured stairs and landings, where each step is a different height.
- Concrete patio calculator and concrete sidewalk calculator: patio sizes, round and L-shaped patios, and walks priced by the foot.
- Concrete slab thickness calculator: you know how much concrete you have and want the thickness it gives.
- Concrete curb calculator: curb and gutter by the linear foot.
- Metric concrete calculator: metres, centimetres and cubic metres for every shape.
FAQ
Frequently asked questions
How many yards of concrete do I need for a 12×12 slab 4 inches thick?
1.78 cubic yards (48 ft³). With 10% extra for waste that is 1.96 yd³, so order 2 yd³ of ready-mix, or buy 88 bags of 80 lb concrete.
How many yards of concrete to pour a 24×24 slab?
At 4 in thick a 24 × 24 ft slab needs 7.11 yd³, or 7.82 yd³ with 10% extra (order 8 yd³). At 6 in, common for garages with heavier vehicles, it needs 10.67 yd³, or 11.75 yd³ ordered.
How many bags of concrete do I need for a 10×10 slab?
At 4 in thick a 10 × 10 ft slab holds 33.3 ft³: 56 bags of 80 lb or 75 bags of 60 lb concrete. Add 10% and buy 62 × 80 lb bags. At 1.23 yd³ a ready-mix delivery is usually less work.
How many bags of concrete do I need for a 4×8 slab?
A 4 × 8 ft slab 4 in thick is 10.7 ft³: 18 bags of 80 lb or 24 bags of 60 lb. With 10% extra, buy 20 × 80 lb bags. A 4 × 4 ft pad needs 9 × 80 lb bags (10 with extra).
How many 80 lb bags of concrete do I need for 3 yards?
135 bags. Each 80 lb bag yields about 0.60 ft³ and 3 yd³ is 81 ft³. That is over 10,000 lb of dry mix, so for 3 yards a ready-mix truck is almost always the better choice.
How thick should a concrete slab be?
Most patios, walkways and shed pads are poured about 4 in thick, and driveways and garage floors that carry heavier vehicles are often 5–6 in. These are common practice, not code: follow your plans and local building code. For a hot tub, follow the maker's pad specification.
How thick should a concrete pad be for a hot tub or shed?
Follow the maker's specification first: hot tub and shed makers publish the base they need. As a volume check, an 8 × 8 ft pad needs 0.79 yd³ at 4 in and 1.19 yd³ at 6 in. Many pads are poured 4 in thick, but that is common practice, not a load rating: check local code, and get a design for heavy loads.
How much does 1 yard of concrete cover at 4 inches thick?
81 square feet. Divide 324 by the thickness in inches: 1 yd³ covers 108 ft² at 3 in, 81 ft² at 4 in, 65 ft² at 5 in and 54 ft² at 6 in.
Should I add extra concrete when ordering?
Yes. This calculator adds 10% by default to cover spillage, form bulges and an uneven base; add more if the base is rough or hard to grade, and ask your supplier what allowance they recommend. Running short mid-pour leaves a cold joint, a weak seam where fresh concrete meets concrete that has already started to set.
How many yards of concrete for a 20×30 slab?
A 20 × 30 ft slab is 600 ft². At 4 in thick it needs 7.41 yd³, or 8¼ yd³ ordered with 10% extra. At 5 in it needs 9.26 yd³ (order 10¼) and at 6 in 11.11 yd³ (order 12¼).
How many yards of concrete for a 30×40 slab?
A 30 × 40 ft slab at 4 in thick needs 14.81 yd³, so order 16½ yd³ with 10% extra. At 6 in it needs 22.22 yd³ (order 24½). Either way that is several truckloads, so book the loads back to back.
How much concrete do I need for a 10×12 slab?
A 10 × 12 ft slab 4 in thick needs 1.48 yd³ (40 ft³): order 1¾ yd³ of ready-mix, or buy 74 bags of 80 lb concrete including 10% extra. At 6 in thick it needs 2.22 yd³.
How much does a concrete slab weigh?
About 50 lb per square foot at 4 in thick, using 150 lb/ft³ for normal concrete. A 12 × 12 ft slab at 4 in weighs about 7,200 lb; at 6 in each square foot weighs 75 lb. Use the weight to plan hauling and demolition.
How much concrete for a monolithic slab with thickened edges?
Add the edge as a separate beam. A 24 × 24 ft slab at 4 in is 7.11 yd³; a 12 in wide edge turned down to 12 in total depth adds 2.27 yd³, for 9.38 yd³. Order 10½ yd³ with 10% extra.
How much concrete do I need for a sidewalk?
A 4 ft wide sidewalk 4 in thick needs 0.49 yd³ per 10 ft of length. A 4 × 50 ft walk needs 2.47 yd³, or 123 bags of 80 lb concrete with 10% extra. A 3 ft walk needs 0.37 yd³ per 10 ft.
How much concrete do I need for a slab in cubic metres?
Multiply length × width in metres by thickness in metres. A 4 × 4 m slab 10 cm thick needs 1.6 m³, or 1.76 m³ with 10% extra. A 3 × 3 m slab at 10 cm needs 0.9 m³: 53 bags of 80 lb concrete exact, or 59 bags with 10% extra.
3 Sources