Key numbers
- Specify: strength, slump, air content, coarse stone size, yards, address and pour time (NRMCA CIP 31)
- Typical strength: 3,500–5,000 psi (25–35 MPa) for most uses (NRMCA)
- Order extra: 4% to 10% over the plan volume (NRMCA)
- Truck mixers carry 8 to 12 yd³ (5 to 9 m³) (NRMCA)
- Break-even bag price = ready-mix ticket ÷ bags for the same yards
On this page
- How to use the Ready-Mix Concrete Price
- What is included in a ready-mix concrete price?
- What should I specify so ready-mix quotes compare?
- Which order fees should I ask about?
- Is ready-mix cheaper than bagged concrete?
- Is ready-mix stronger than bagged concrete?
- How much ready-mix should I order?
- Who is responsible for what on delivery day?
- Common mistakes when buying ready-mix
- Frequently asked questions
How to use the Ready-Mix Concrete Price
- 1Choose the shapePick slab / pad, monolithic slab, round slab, footing, column / sonotube, post holes, steps, wall, curb & gutter, square / rect. column, beam or hollow cylinder. Each shape uses its own volume formula.
- 2Pick your unitsEvery dimension has its own unit menu (in, ft, yd, cm or m); changing one converts that number so the size stays the same. The US / Metric switch sets all fields to feet and inches or meters and centimeters and resets them to typical values.
- 3Enter the dimensionsType the length (default feet), width (default feet) or thickness (default inches). Measure the inside of the forms and the depth in several places.
- 4Set waste and quantityUse the waste slider (0 to 20%, default 10%) and allow more on uneven ground. If you have several identical pours, enter how many.
- 5Read the resultsSee the volume in cubic yards, cubic feet and cubic meters, the ready-mix order rounded up to ¼ yard, the number of 90, 80, 60, 50 and 40 lb bags rounded up, and the weight at the density you choose (150, 145 or 140 lb/ft³).
- 6Price it and save itPick a pricing basis (per cubic yard, per cubic meter or per bag of the highlighted size) and enter your local price for a material cost. Use Add to project to total several pours, and Copy link to share the exact result.
Results update as you type. Back to the calculator ↑

What is included in a ready-mix concrete price?
A ready-mix price is the plant’s price per cubic yard (yd³) for one mix design, delivered fresh in a truck mixer. It covers the batched concrete and normal delivery; order fees such as short-load, waiting time or after-hours charges are added on the ticket. Ready-mix is made and delivered under ASTM C94/C94M, the US specification for ready mixed concrete, and the National Ready Mixed Concrete Association (NRMCA) notes there is “no typical recipe”: materials and proportions vary by region and by the properties you ask for. That is why we do not print a national average. Prices only compare when every plant quotes the same mix.
Ready-mix ticket = ordered yd³ × price per yd³ for the specified mix + additives per yd³ + order fees
This page is about what you are buying and how to compare it with bagged concrete. For coverage per yard and price-per-yard conversions, see concrete price per yard; for truckloads and fees by order size, see concrete delivery cost.
What should I specify so ready-mix quotes compare?
Give every plant the same five items. NRMCA’s guide to ordering (CIP 31) lists what the purchaser should state, and each one can change the price per yard.
| Item | What NRMCA says is common | Metric | Why it moves the price |
|---|---|---|---|
| Strength (28-day) | 3,500–5,000 psi for most applications | 25–35 MPa | More cement for higher strength |
| Coarse stone size | 3/4 or 1 in nominal maximum | 19.0 or 25.0 mm | Smaller stone may be needed for thin sections or tight rebar |
| Slump | 3–5 in for most work; 2 in max for slip-form; 7–9 in for walls, pumping or congested rebar | 76–127 mm; 51 mm; 178–229 mm | Higher slump without extra water needs admixtures |
| Air content | Required where concrete freezes in service; delivered tolerance ±1.5% | same | Air-entraining admixture |
| Extras | Extended workability, set control, shrinkage reduction, fibers, integral color, special aggregates | same | Usually priced per yd³ |
Also tell the plant the quantity in yards, the street address, how the concrete will be placed (chute or pump, and pump line size), the delivery rate and the start time. NRMCA adds that ASTM C94/C94M requires the purchaser to provide a copy of the project specifications if there are any. Strength in MPa is psi × 0.006895 (3,500 psi ≈ 24.1 MPa, 5,000 psi ≈ 34.5 MPa); NRMCA rounds to 25–35 MPa.
Order by performance, not recipe
NRMCA calls ordering by measurable performance, such as strength, the preferred method. If you instead dictate materials and proportions (a “prescription” order), the producer has little flexibility and cannot take responsibility if the concrete misses the intended performance.
Which order fees should I ask about?
A low price per yard can still be the dearer ticket. Ask each plant for every line below and add them up before you compare; the concrete delivery cost page shows how each flat fee spreads over the yards.
- Short-load fee. A flat charge below the plant’s minimum load. Ask the threshold and the amount, and whether it applies per truck or per order.
- Additives per yard. Accelerator, retarder, fiber, color and air entrainment where needed.
- Waiting time. Free unloading time, then a charge. Under ASTM C94/C94M-24d the purchaser (or else the producer) sets the time limit to finish discharge, and it is printed on the ticket.
- Zone or distance charge. Some plants add one beyond a set radius.
- After-hours and weekend. Usually flat.
- Pump or conveyor. Quoted separately when the truck cannot reach the forms.
Worked example: two quotes for the same 3 yd³
- Plant A: an example $150 per yd³ plus a $200 fee under 5 yd³ → 3 × $150 + $200 = $650
- Plant B: an example $165 per yd³, no short-load fee → 3 × $165 = $495
- The plant that is $15 dearer per yard is $155 cheaper on this job. At 6 yd³, with no fee at either, A ($900) beats B ($990).
- Placeholder prices to show the arithmetic. Use your plants’ real quotes.
Is ready-mix cheaper than bagged concrete?
Work out the bag price at which the two cost the same. Divide the full ready-mix ticket by the number of bags that make the same volume; if your store’s bag price is above that figure, ready-mix is cheaper. Bag counts use QUIKRETE’s data-sheet yields (80 lb ≈ 0.60 ft³, 60 lb ≈ 0.45 ft³), rounded up to whole bags. To run both totals side by side with your quotes, use the ready mix concrete calculator (truck vs bags).
Break-even bag price = ready-mix ticket for V yd³ ÷ bags needed for V yd³
| Order (yd³) | Order (m³) | 80 lb bags | 60 lb bags | Ready-mix ticket (example quote) | Break-even per 80 lb bag | Break-even per 60 lb bag | Dry mix to handle (80 lb bags) |
|---|---|---|---|---|---|---|---|
| ½ | 0.38 | 23 | 30 | $275 | $11.96 | $9.17 | 1,840 lb (835 kg) |
| 1 | 0.76 | 45 | 60 | $350 | $7.78 | $5.83 | 3,600 lb (1,633 kg) |
| 1½ | 1.15 | 68 | 90 | $425 | $6.25 | $4.72 | 5,440 lb (2,468 kg) |
| 2 | 1.53 | 90 | 120 | $500 | $5.56 | $4.17 | 7,200 lb (3,266 kg) |
| 3 | 2.29 | 135 | 180 | $650 | $4.81 | $3.61 | 10,800 lb (4,899 kg) |
| 4 | 3.06 | 180 | 240 | $800 | $4.44 | $3.33 | 14,400 lb (6,532 kg) |
| 5 | 3.82 | 225 | 300 | $750 | $3.33 | $2.50 | 18,000 lb (8,165 kg) |
The ticket column uses one placeholder quote, $150 per yd³ plus a $200 short-load fee below 5 yd³, computed with the site’s cost function (scripts/ready-mix-concrete-price.ts). It is not a typical price. Swap in your own: the method stays the same. Two patterns hold whatever the prices: the break-even bag price falls as the order grows, and it jumps at the plant’s short-load threshold.
Bags still carry costs the table leaves out: mixer rental, water, and lifting every bag at least twice. A 2 yd³ job in 80 lb bags is 7,200 lb of dry mix. Bags win on very small or remote pours, and when the work can be done in stages; ready-mix wins when the slab must be placed in one go.
Is ready-mix stronger than bagged concrete?
Ready-mix is batched to the strength you order; a bag has a fixed rating. QUIKRETE’s Concrete Mix (No. 1101) data sheet lists 2,500 psi (17.2 MPa) at 7 days and 4,000 psi (27.5 MPa) at 28 days. NRMCA puts most ready-mix orders at 3,500–5,000 psi. So for a patio or walk the two can be similar; the difference is control. Ready-mix arrives at a stated slump and air content within ASTM C94 tolerances, while a bag’s result depends on how much water each batch gets. For the difference between cement and concrete themselves, see cement vs concrete.
How much ready-mix should I order?
Order 4% to 10% more than the volume from plan dimensions, NRMCA advises, then round up to the plant’s step (often ¼ yd³; ask). Re-check the quantity before you finish the pour, and avoid both a large leftover and a small clean-up load, which brings its own fee.
| Job | Plan volume (yd³) | Plan volume (m³) | Order at +4% (yd³) | Order at +10% (yd³) | Loads at 8 yd³ | Loads at 12 yd³ |
|---|---|---|---|---|---|---|
| 10 × 10 ft slab, 4 in | 1.23 | 0.94 | 1½ | 1½ | 1 | 1 |
| 12 × 12 ft slab, 4 in | 1.78 | 1.36 | 2 | 2 | 1 | 1 |
| 100 ft footing, 16 × 8 in | 3.29 | 2.52 | 3½ | 3¾ | 1 | 1 |
| 20 × 20 ft slab, 4 in | 4.94 | 3.78 | 5¼ | 5½ | 1 | 1 |
| 24 × 24 ft slab, 4 in | 7.11 | 5.44 | 7½ | 8 | 1 | 1 |
| 12 × 60 ft driveway, 5 in | 11.11 | 8.50 | 11¾ | 12¼ | 2 | 2 |
| 40 × 60 ft slab, 4 in | 29.63 | 22.65 | 31 | 32¾ | 5 | 3 |
Load counts use the +10% order and NRMCA’s 8 to 12 yd³ (5 to 9 m³) range for truck mixers; your plant’s figure may differ. On the 20 × 20 ft slab, the step from +4% to +10% is ¼ yd³; at an example $150 per yard that is $37.50, cheap insurance against a second truck. Volumes for other shapes come from the concrete yards calculator.
Who is responsible for what on delivery day?
The price assumes you are ready when the truck arrives. NRMCA’s CIP 31 sets out the split:
- The producer delivers the slump and air you ordered, within tolerance, measured at discharge from the truck, and is responsible for the slump for 30 minutes after the requested time or the truck’s arrival, whichever is later.
- The purchaser passes on every project requirement, checks the mix on the ticket, directs the truck, and signs the ticket noting anything unusual.
- Site changes are on you: the producer cannot answer for quality if excess water, admixtures, fibers or other products are added at the site, or if the crew is not ready to take the concrete.
- Access matters for cost and safety: NRMCA says a loaded truck weighs about 80,000 lb (36,000 kg) and may not manage loose dirt or residential curbs, so plan a pump or other placing method where access is tight.
Concrete normally sets and hardens within two to eight hours after mixing (NRMCA), which is why waiting time is billed and why the discharge time limit goes on the ticket.
Common mistakes when buying ready-mix
- Comparing prices for different mixes. A 3,000 psi quote and a 4,000 psi quote with air are different products. Send every plant the same spec list.
- Ignoring fees. In the worked example, the plant $15 cheaper per yard cost $155 more on 3 yd³.
- Buying bags on habit. Above about a yard, check the break-even bag price; small orders near the short-load threshold are where bags can still win.
- Ordering the exact plan volume. NRMCA’s 4–10% margin exists because forms bow and bases vary.
- Adding water to make it easier to place. It can lower strength and shifts responsibility for quality to you.
To cost the whole slab with labor and base, use cost to pour a concrete slab; to get volume for any shape, start on the concrete calculator.
FAQ
Frequently asked questions
Is ready-mix cheaper than bagged concrete?
Above about a yard it usually is, but compare totals. Divide the ready-mix ticket by the bags for the same volume to get a break-even bag price. With example quotes of $150 per yard and a $200 fee under 5 yd³, 2 yd³ ($500) beats bags priced above $5.56 per 80 lb bag.
How much is 1 yard of ready-mix concrete?
Your plant's price per yard plus any fee for a small load. With an example $150 per yard and a $200 short-load fee, 1 yd³ costs $350, which equals 45 × 80 lb bags at $7.78 each. Ask the plant for its real price and fee.
What do I need to tell the plant when ordering ready-mix?
NRMCA lists the coarse stone size (usually 3/4 or 1 in), slump (3 to 5 in for most work), air content where it freezes, strength, the yards, the address, the pour time and how it will be placed, such as by pump. Give every plant the same list so quotes match.
How much extra ready-mix should I order?
NRMCA suggests 4% to 10% over the volume from plan dimensions. A 20 × 20 ft slab at 4 in is 4.94 yd³: that is 5¼ yd³ with 4% extra and 5½ yd³ with 10%, rounded up to the next ¼ yd³.
What strength of ready-mix should I order?
The strength your plans or local code require. NRMCA says 3,500 to 5,000 psi (25 to 35 MPa) is typical for most applications and generally gives durable concrete. Ask every plant to quote the same strength so the prices compare.
How much does a ready-mix truck hold?
NRMCA gives 8 to 12 yd³ (5 to 9 m³) for truck mixers, but ask your plant. A 40 × 60 ft slab at 4 in, ordered with 10% extra as 32¾ yd³, is 5 loads at 8 yd³ or 3 loads at 12 yd³.
Can I add water to ready-mix on site?
Only up to the amount the mix design allows. NRMCA warns that excess water can cause segregation, delay setting, raise cracking risk and reduce strength and durability, and the producer is not responsible for quality when water beyond that is added at the job.
Is bagged concrete as strong as ready-mix?
QUIKRETE's Concrete Mix data sheet lists 4,000 psi at 28 days. Ready-mix is batched to the strength you order, typically 3,500 to 5,000 psi (NRMCA). For structural work, order the strength your plans specify and test it if required.
4 Sources
- NRMCA, Concrete in Practice CIP 31: Ordering Ready Mixed Concrete (2000, 2016, 2023): ASTM C94/C94M; stone size, slump, air, strength 3,500–5,000 psi; order 4–10% extra; truck mixers 8–12 yd³; loaded truck about 80,000 lb; responsibilities
- ASTM C94/C94M-24d discharge time limits, as quoted in California HCAI Policy Intent Notice 82 (effective 9 Oct 2025)
- QUIKRETE Concrete Mix (No. 1101) data sheet: 80 lb ≈ 0.60 ft³, 60 lb ≈ 0.45 ft³; 4,000 psi at 28 days
- NIST SP 811 Appendix B.9: 1 yd³ = 0.7645549 m³; 1 lb = 0.4535924 kg
Last reviewed October 10, 2026 by M Bilal. Found an error? Tell us.