Multiply length × width in feet by depth in inches, divide by 324 for cubic yards, then multiply by your supplier's tons per yd³ (this calculator uses a typical 1.6). A 12 × 60 ft driveway base 4 in deep needs 8.89 yd³, about 14.22 tons at 1.6, or 16.36 tons with 15% extra for compaction.

By Izhar Ahmad DanishReviewed by M BilalUpdated

ft
ft
in
t/yd³

Listed densities are planning values (see each page for its source). Ask your supplier for theirs and type it above: wet or washed material can weigh 10–15% more.

You need

0 yd³

0 ft³ · 0 m³

Weight (US tons)

0

Metric tonnes

0

$

Material cost—

Key numbers

  • Formula: L (ft) × W (ft) × depth (in) ÷ 324 = cubic yards
  • Crusher run is figured at a typical 1.6 tons per yd³ as a planning value (use your supplier's figure); compacted dense-graded base measured 1.78–1.98 in a Wisconsin DOT study
  • 1 ton covers about 101 ft² at 2 in, 68 ft² at 3 in and 51 ft² at 4 in (at the 1.6 planning value)
  • Allow about 15% extra, rather than the usual 10%, when the base will be compacted; confirm with your supplier
On this page
  1. How to use the Crusher Run Calculator
  2. How to calculate how much crusher run you need
  3. How much crusher run for common sizes?
  4. What is crusher run, and is it the same as road base?
  5. How many tons of crusher run in a yard?
  6. Why crusher run needs more extra: compaction
  7. How deep should crusher run be?
  8. Crusher run for gravel roads and long drives
  9. Common mistakes when ordering crusher run
  10. Crusher run calculator vs crushed stone, driveway gravel and asphalt calculators: which one to use
  11. Frequently asked questions

How to use the Crusher Run Calculator

  1. 1Describe the areaChoose Rectangle (length × width), Circle (diameter) or Known area if you already have the square footage.
  2. 2Pick your unitsUse US (feet and inches) or Metric (meters and centimeters). Switching converts the numbers you typed, so the area stays the same.
  3. 3Enter the depthType how deep the crusher run / road base should be, 4 in is a common starting point for this job.
  4. 4Choose the materialThe calculator uses 1.6 tons per cubic yard for crusher run / road base. Use your supplier's figure if it differs.
  5. 5Allow for settlingChoose the extra: none, 5%, 10% (the default) or 20% for a base you will compact.
  6. 6Read and price the resultsSee cubic yards, cubic feet, cubic meters, US tons and metric tonnes. Enter your supplier's price per ton for the total cost.

Results update as you type. Back to the calculator ↑

Illustration of gray crusher run with stone dust spread and compacted as a driveway base

How to calculate how much crusher run you need

Crusher run is ordered by the ton, and you get tons from three measurements. Measure length and width in feet and the finished depth in inches, then:

Cubic yards = length (ft) × width (ft) × depth (in) ÷ 324
Tons = cubic yards × 1.6 (typical planning value)
Order = tons × 1.15 for a compacted base

The 324 is 12 inches per foot × 27 cubic feet per cubic yard. The calculator above does the same math and also gives cubic feet, cubic meters and metric tonnes. Its extra-for-compaction setting defaults to 10% and offers none, 5%, 10% or 20%. For a base you will compact with a plate or roller, this page suggests about 15%: set the extra to none and multiply the tons by 1.15, or pick 20% for more margin. The section on compaction below explains why.

  1. Measure the area. Split odd shapes into rectangles and add them.
  2. Use the finished, compacted depth from your plan, such as 4 in for a pad.
  3. Run the calculator with the crusher run preset, or replace 1.6 with your supplier’s weight per yard.
  4. Allow about 15% extra for a compacted base (tons × 1.15), and order in tons.

Worked example: 12 × 60 ft driveway base, 6 in compacted

  • 12 × 60 × 6 ÷ 324 = 13.33 yd³ (360 ft³, 10.19 m³)
  • Planning weight: 13.33 × 1.6 = 21.33 tons
  • With 15% for compaction and waste: about 24.53 tons to order
  • Check: at a compacted 1.85 tons per yd³, inside the range Wisconsin DOT measured, the same base is 24.67 tons

Place it in two lifts of about 3 in each and compact each one, rather than spreading 6 in loose and rolling once.

How much crusher run for common sizes?

People usually search with their own dimensions. The table uses 1.6 tons per yd³ and shows the order with 15% extra. Every figure comes from the site’s calculation library.

Area Cubic yards at 4 in Tons at 3 in Tons at 4 in Tons at 6 in Order at 4 in with 15% (tons)
8 × 10 ft (80 ft²) 0.99 1.19 1.58 2.37 1.82
10 × 10 ft (100 ft²) 1.23 1.48 1.98 2.96 2.27
10 × 12 ft (120 ft²) 1.48 1.78 2.37 3.56 2.73
12 × 12 ft (144 ft²) 1.78 2.13 2.84 4.27 3.27
10 × 20 ft (200 ft²) 2.47 2.96 3.95 5.93 4.54
20 × 20 ft (400 ft²) 4.94 5.93 7.90 11.85 9.09
12 × 60 ft (720 ft²) 8.89 10.67 14.22 21.33 16.36
20 × 40 ft (800 ft²) 9.88 11.85 15.80 23.70 18.17
1,000 ft² 12.35 14.81 19.75 29.63 22.72
2,000 ft² 24.69 29.63 39.51 59.26 45.43

Each inch of depth adds 4.94 tons of crusher run per 1,000 ft² at the 1.6 planning value. So 5 in on 1,000 ft² is 24.69 tons before the allowance, and 8 in is 39.51 tons.

What is crusher run, and is it the same as road base?

Crusher run is crushed stone that is not washed or screened down to one size, so it keeps the small pieces and stone dust the crusher makes. Engineers call this a dense-graded aggregate: the sizes range from coarse to fine, the fines fill the gaps between larger stones, and the mix compacts into a hard, stable layer.

The same kind of material is sold under many names: crusher run, crush and run, road base, graded aggregate base (GAB), dense-graded aggregate (DGA) and aggregate base course. State DOTs publish their own grades with exact sieve limits. For example, a road-agency aggregate base specification hosted by the Minnesota DOT’s research program calls for dense-graded aggregate grades 21AA, 21A or 22A, and Wisconsin DOT grades include dense graded base in 3/4 in, 1 1/4 in and 3 in sizes. A local quarry’s “crusher run” may or may not match a DOT grade; ask which product it is if your plans name one.

Clean crushed stone such as #57 is the opposite. An FHWA study classes #57 as open-graded: under the AASHTO M43 (ASTM D448) gradation it cites, only 0–5% of #57 passes the No. 8 sieve, so it has voids that drain. Crusher run fills those voids. That single difference decides most material choices:

  • Firm surface or base that must not shift: crusher run.
  • Drainage and French drains: clean stone, sized on the crushed stone calculator.
  • Both: clean stone below, crusher run on top, as many gravel driveways are built.

How many tons of crusher run in a yard?

This calculator uses 1.6 tons per cubic yard, which is 3,200 lb per yard or about 118.5 lb per cubic foot, as a planning value. Use your supplier’s figure when they give one.

Tons of crusher run Cubic yards (at 1.6) Cubic feet ft² covered at 4 in
1 0.63 16.9 51
5 3.13 84.4 253
10 6.25 168.8 506
15 9.38 253.1 759
20 12.50 337.5 1,013

How much does a ton of crusher run cover?

Depth ft² per ton (at 1.6) lb per ft² Tons per 1,000 ft²
1 in 202.5 9.9 4.94
2 in 101.3 19.8 9.88
3 in 67.5 29.6 14.81
4 in 50.6 39.5 19.75
6 in 33.8 59.3 29.63
8 in 25.3 79.0 39.51

Compare these with #57 stone at the same depth: using typical planning weights of 1.35 and 1.6 tons per yd³, a ton of #57 covers 60 ft² at 4 in against about 51 ft² (50.6) for crusher run. Check both weights with your supplier.

Why crusher run needs more extra: compaction

Crusher run gets heavier per cubic yard as you compact it, so a planning weight per yard can under-order a compacted base unless you add more allowance than usual. This is the main difference between this page and a plain gravel estimate.

A Wisconsin DOT research report measured real dense graded base samples from projects around the state. Compacted, they weighed 1.78 to 1.98 tons per cubic yard across the 3/4 in, 1 1/4 in and 3 in sizes, and WisDOT’s own statewide conversion factors for compacted dense graded base run from 1.75 to 2.2. The report also measured how much the material bulks up from compacted to loose: 34% to 52% for 1 1/4 in dense graded base (34–47% and 34–45% for the 3/4 in and 3 in sizes).

Set against this calculator’s 1.6 tons per yard planning value, the measured compacted weights are about 11% to 24% higher, which is why this page suggests about 15% extra. That is a comparison with a planning figure, not a measured loose weight: the same report’s 34–52% expansion implies truly loose dense graded base weighs less than 1.6, so always ask your supplier how their tons-per-yard figure was measured. Here is how the same jobs look on each basis:

Job, compacted depth At 1.6 planning (tons) 1.6 + 15% (tons) Compacted 1.75 Compacted 1.85 Compacted 1.98
10 × 10 ft, 4 in 1.98 2.27 2.16 2.28 2.44
20 × 20 ft, 4 in 7.90 9.09 8.64 9.14 9.78
12 × 60 ft, 4 in 14.22 16.36 15.56 16.44 17.60
12 × 60 ft, 6 in 21.33 24.53 23.33 24.67 26.40

The 1.6 planning value plus 15% lands close to the middle of the measured range. If you are compacting to a high density on a large job, or your supplier tells you their product’s compacted weight, use that figure in the calculator directly and keep a smaller allowance for waste.

Compact in layers

The aggregate base specification hosted by MnDOT requires compacting aggregate in layers no greater than 6 inches. A home project is not bound by a highway spec, but the reason holds: a plate compactor cannot densify a thick layer all the way down. For a 6 in base, spread and compact two lifts of about 3 in. For 8 in, two lifts of 4 in. The total tonnage does not change; on a 12 × 60 ft drive, 8 in of crusher run is 28.44 tons at 1.6, or about 32.7 tons with 15% extra.

Worked example: 10 × 20 ft parking pad, 6 in base

  • 10 × 20 × 6 ÷ 324 = 3.70 yd³ (3.704 unrounded; 100 ft³, 2.83 m³)
  • Planning weight: 3.704 × 1.6 = 5.93 tons
  • With 15% for compaction: about 6.81 tons to order
  • Placed in two compacted lifts of about 3 in

If the pad will be paved, size the asphalt separately on the asphalt calculator: 2 in of hot mix on 200 ft² is 2.42 tons.

Crusher run per square metre

Outside the US, similar material is usually sold as sub-base or road base by the tonne. At 1.6 US tons per yd³ that is about 1.9 tonnes per m³: about 190 kg per m² at 100 mm and 285 kg per m² at 150 mm. A 5 × 4 m pad at 100 mm is 2 m³, about 3.8 tonnes, or about 4.37 tonnes with 15%.

How deep should crusher run be?

There is no single depth: it depends on the load, the soil underneath and what goes on top. A design from your contractor, engineer or local road department overrides any rule of thumb. What the calculator can show is what each choice costs in tons.

  • Shed pads, patio bases and walkways: commonly 4 in compacted. A 12 × 12 ft pad is 2.84 tons at 4 in (at 1.6).
  • Driveway and parking pad bases: usually thicker, built in two or more compacted lifts. Every inch on a 12 × 60 ft drive is about 3.56 tons at 1.6.
  • Top dressing on an existing gravel drive: often 1–2 in. One ton covers about 101 ft² at 2 in.
  • Under asphalt or concrete: the base thickness comes from the paving or slab design. Size the slab on the concrete slab calculator or the paving on the asphalt calculator.

Soft or wet subgrade usually needs more base, not less, and sometimes a geotextile underneath. If the ground ruts when you walk or drive on it, ask a local contractor before deciding the depth.

Crusher run for gravel roads and long drives

Long runs are where small errors turn into truckloads. A farm road 10 ft wide and 500 ft long at 6 in deep is 5,000 ft², 92.59 yd³, about 148 tons of crusher run at 1.6, or about 170 tons with 15% extra. A 12 ft wide lane 1,000 ft long at 4 in is 148.15 yd³, about 237 tons at 1.6, or about 273 tons with 15%.

On jobs this size, ask the quarry three things before you trust the total: the weight per yard of its product, whether it can quote by the compacted cubic yard, and what its trucks carry. Then divide the tons by the load size and round up. Measure the road along its centerline, including curves, and add any pull-offs and turnarounds as separate rectangles.

Common mistakes when ordering crusher run

Most crusher run orders go wrong on compaction and naming. These are the errors that cost the most.

  • Using the planning weight with only 10% extra for a compacted base. On a 12 × 60 ft drive at 6 in, 10% gives 23.47 tons, while the compacted range Wisconsin DOT measured (1.78–1.98 tons per yd³) implies about 23.7 to 26.4 tons. Allow about 15%, and confirm with your supplier.
  • Spreading one thick layer. A 6 in or 8 in base compacted in one pass stays soft underneath. Compact in lifts.
  • Using crusher run where water must drain. Its fines fill the voids. Put clean #57 below it where drainage matters.
  • Assuming every “road base” is the same. Gradations differ by quarry and DOT grade. Ask which product it is and what it weighs per yard.
  • Ordering yards when the quarry sells tons. Ordering “8.89 tons” for an 8.89 yd³ base brings about 5.56 yd³, 37.5% short at 1.6 tons per yd³.
  • Entering depth in feet. A 10 × 10 ft pad at 4 in is 1.23 yd³; typed as 4 ft it is 14.81 yd³.

Crusher run calculator vs crushed stone, driveway gravel and asphalt calculators: which one to use

This calculator is for dense-graded base with fines: crusher run, road base, DGA. Use a related tool when the material or the job is different:

FAQ

Frequently asked questions

How much crusher run do I need for a 10×10 area?

At 4 in deep a 10 × 10 ft area needs 1.23 yd³, about 1.98 tons of crusher run at a typical 1.6 tons per yd³ (check your supplier's figure). Add 15% for compaction and order about 2.27 tons. At 6 in it needs 2.96 tons before the allowance.

How much crusher run do I need for a 12×12 patio or shed pad?

A 12 × 12 ft pad at 4 in needs 1.78 yd³, about 2.84 tons of crusher run. With 15% extra for compaction order about 3.27 tons. A 10 × 12 ft shed pad at 4 in needs 2.37 tons before the allowance.

How much crusher run for a 20×20 area?

A 20 × 20 ft area at 4 in needs 4.94 yd³, about 7.9 tons of crusher run, or 9.09 tons with 15% extra. At 6 in it needs 7.41 yd³ (11.85 tons), or about 13.63 tons ordered.

How much crusher run do I need for a driveway?

A 12 × 60 ft driveway needs 14.22 tons at 4 in and 21.33 tons at 6 in, using 1.6 tons per yd³. With 15% extra for compaction, order about 16.36 or 24.53 tons. Build thick bases in compacted layers.

How many tons of crusher run are in a yard?

About 1.6 tons (3,200 lb) per cubic yard is the planning figure this calculator uses; suppliers' figures vary, so ask yours. Compacted, a Wisconsin DOT study measured dense graded base at 1.78 to 1.98 tons per cubic yard.

How many yards are in a ton of crusher run?

About 0.63 yd³, or 16.9 ft³, per ton at 1.6 tons per yard. Ten tons is about 6.25 yd³, 15 tons about 9.38 yd³ and 20 tons about 12.5 yd³ of crusher run. Check your supplier's weight per yard.

How much does a ton of crusher run cover?

One ton covers about 203 ft² at 1 in, 101 ft² at 2 in, 68 ft² at 3 in and 51 ft² at 4 in, figured at a typical 1.6 tons per yd³. Compacted, it covers less, so allow about 15% extra when ordering.

What is crusher run?

Crusher run is crushed stone left mixed with the smaller pieces and stone dust the crusher produces. Engineers call this dense-graded aggregate: the fines fill the gaps, so it compacts to a hard base. It is also sold as road base or DGA.

Is crusher run the same as road base?

Usually yes in practice. Road base, crusher run, crush and run, DGA and graded aggregate base all describe a dense-graded blend of stone and fines. State DOT grades set exact sieve limits, so ask your supplier which grade they sell.

How deep should crusher run be?

Patio and shed pads often use 4 in, and driveway bases several inches more, placed in layers. One road-base specification limits each compacted layer to 6 in, so thicker bases go down in two or more lifts.

How much does crusher run compact?

A Wisconsin DOT study measured compacted dense graded base at 1.78–1.98 tons per yd³, about 11–24% more than the 1.6 planning figure this calculator uses. That is why this page suggests about 15% extra rather than 10%; ask your supplier for their product's weight.

Does crusher run drain well?

Not as well as clean stone. The fines that let crusher run pack hard also fill the gaps that water would use. Where drainage matters, use clean #57 stone underneath and keep crusher run as the top layer.

Crusher run vs #57 stone: which do I need?

Use crusher run for a firm, packed surface or base; use #57 for drainage. On a 20 × 20 ft area at 4 in, crusher run is 7.9 tons and #57 is 6.67 tons using typical planning weights of 1.6 and 1.35 tons per yd³; your supplier's figures may differ.

How much crusher run for a gravel road?

A 10 ft wide road 500 ft long at 6 in deep needs 92.59 yd³, about 148 tons of crusher run, or about 170 tons with 15% extra. Long roads are usually bid by your road-base supplier from the same numbers.

How much crusher run per square metre?

At about 1.9 tonnes per m³ (1.6 US tons per yd³), crusher run weighs about 190 kg per m² at 100 mm and 285 kg per m² at 150 mm. A 5 × 4 m pad at 100 mm needs 3.8 tonnes.

3 Sources

  1. Wisconsin DOT research report 0092-22-05, Weight-Volume Relationships and Conversion Factors for Soils and Aggregates of Wisconsin: compacted dense graded base 1.78–1.98 tons/yd³ across sizes, compacted-to-loose expansion 34–52% (1 1/4 in)
  2. Aggregate Base Course specification, Section 302 (NRRA geotechnical team, Minnesota DOT): dense-graded aggregate, compacted layers no greater than 6 in
  3. FHWA, Strength Characterization of Open-Graded Aggregates for Structural Backfills (FHWA-HRT-15-034): open-graded AASHTO M43 No. 57 gradation (0–5% passing No. 8, Table 4) for comparison

Last reviewed October 9, 2026 by M Bilal. Found an error? Tell us.

Before you pour

Save this for pour day

One short email a month with seasonal pour tips, price-check advice and new calculators. Unsubscribe anytime.